Jag'd Construction Inc., George Washington Bridge

George Washington Bridge


FORT LEE, NJ


2012 - Current


PROJECT INFORMATION


CONTRACT NO. GWB 244.022

Jag’d Construction has been actively performing painting and access work on the George Washington Bridge since 2012, building long-term, hands-on experience across one of the most heavily traveled and operationally demanding bridges in the country.


Over the years, our crews have worked throughout the structure, gaining real-world familiarity with its layout, sequencing, and the challenges that come with maintaining production in a live traffic environment. From upper elevations to under-deck operations, we have consistently executed work across all areas of the bridge, adapting to evolving project requirements and access conditions.


A key highlight of our recent involvement includes participation in the Main Cable Rehabilitation and sidewalk improvement work—highly specialized, one-of-a-kind operations that required advanced access approaches, tight coordination, and disciplined execution. These efforts reflect our ability to take on complex scopes in constrained environments while maintaining safety, schedule, and quality.


Our continued presence on the George Washington Bridge is built on performance, reliability, and a clear understanding of how to operate efficiently within one of the most demanding bridge systems in the region.


Competent Person: George Lyras

BRIDGE PROJECT

AMPP QP1 field application SSPC Accredited Contractor
AMPP QP2 field application SSPC Accredited Contractor
JAG'D Construction a Certified ISNetworld Member

CERTIFICATIONS

Jag'd Construction Inc. proudly holds AMPP certification with QP1 and QP2 accreditations for industrial painting and hazardous coating removal and is ISN Certified®.